This Montana has a 48VDC output to feed the electricity directly into the battery bank of the telecom site. Due to high wind speeds at the location, almost 6kW output is not uncommon. The installation is a hybrid configuration with a diesel generator as a back up....
by eric | Jun 16, 2015 |
Kenya telecom power supply application. Project Name: Kenya power supply unit Type of wind turbine: Alize 10 kW on guyed tower Configuration: Off-grid Battery charging Location of application: Kenya Status: Commissioning in 2005 Category of the project: Telecom...